Facility
Plant policy, in writing.
If a rule is not here, it is not a loophole. Members get the same policy inside Plant Partner Kit.
- What the membership is
- Partner Access is the gate: templates, intake, calendar rules, and Ops Chat. It is not a tour, a kitchen rental, or a production contract.
- What it is not
- It does not include line time, ingredients, packaging inventory, or a guaranteed first-run date. Certificates and audit packets live in a written production agreement — not in a $249 membership.
- Visitors
- The floor is not a showroom. Visitors follow plant policy or they do not enter. Photography needs written approval. Hair, jewelry, phones, and food on the floor follow the same rules as staff.
- Confidentiality
- Formulas submitted in SKU Intake are treated as confidential manufacturing information. Do not send a recipe to a personal inbox or a public thread.
- Allergen and sanitation
- Runs are scheduled by campaign. Changeovers are planned. A “quick add-on SKU” that breaks a campaign is refused.
- Hold and release
- Nothing ships because someone is in a hurry. Lots move with documentation. Memory is not a control.
Onboarding & Intake Roadmap
Production batch minimums and onboarding milestones, in writing.
Checkout hesitation is usually timing. Here is what happens after you apply, including spec submission timelines and the intake details the plant needs before a pilot run.
01
Instant access to Spec Templates & SKU Intake
Same day you pay: download spec templates and open the SKU Intake portal. Submit formula, pack format, allergen map, and target volume. Production batch minimums are listed in the templates so you know the floor before review.
02
Review call and plant calendar within 5 business days
Ops schedules a spec review and plant calendar walkthrough within 5 business days of a complete intake. Incomplete specs are sent back. They do not get a calendar hold.
03
Batch run pilot authorization
After fit review, you authorize a pilot batch against published production batch minimums. Line time is quoted in writing. Membership is the gate, not a production deposit.
